<?xml version="1.0" encoding="UTF-8" ?><!-- generator=Zoho Sites --><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><atom:link href="https://www.btc-ksa.com/Knowledge-Hub/tag/air-cooled-heat-exchangers/feed" rel="self" type="application/rss+xml"/><title>BTGC - Knowledge Hub #air-cooled heat exchangers</title><description>BTGC - Knowledge Hub #air-cooled heat exchangers</description><link>https://www.btc-ksa.com/Knowledge-Hub/tag/air-cooled-heat-exchangers</link><lastBuildDate>Wed, 18 Nov 2026 11:17:44 -0800</lastBuildDate><generator>http://zoho.com/sites/</generator><item><title><![CDATA[Keeping Air-Cooled Heat Exchangers Effective in Saudi Summer]]></title><link>https://www.btc-ksa.com/Knowledge-Hub/post/air-cooled-heat-exchanger-summer-performance-saudi-arabia</link><description><![CDATA[<img align="left" hspace="5" src="https://www.btc-ksa.com/knowledge-hub/kelvion-industrial-air-cooler.webp"/>Why air coolers lose capacity in summer heat and dust, and how fin cleaning, fan checks, recirculation control and spray cooling restore it. Kelvion from BTGC.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_EUkUrt7PRZqTXJ8ipakNYA" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_Sq8IdYBDSZGUhL6KvesxFw" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_S653DFTVRpmaVyCSNLcbOg" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_rMUp58yuugwjjxqZCWEEEQ" data-element-type="codeSnippet" class="zpelement zpelem-codesnippet "><div class="zpsnippet-container"><p class="btgc-byline" style="margin:0 0 14px;color:rgb(74, 85, 104);font-size:14px;">By <strong>BTGC Engineering Team</strong> · Business Tribune Global Company, Saudi Arabia</p><blockquote style="background:rgb(238, 244, 251);border-left:4px solid rgb(21, 101, 192);padding:14px 18px;margin:0 0 18px;border-radius:6px;"><p><strong>In short:</strong> air-cooled heat exchangers reject heat to ambient air, so their capacity falls as the air gets hotter, exactly when Saudi plants need them most. Dust-clogged fins, slipping belts, wrong fan blade pitch and hot air recirculating from outlet to inlet make the summer shortfall worse. A pre-summer programme of fin cleaning, fan and drive checks and recirculation control, and in some cases spray or adiabatic pre-cooling, recovers much of the lost duty. BTGC supplies Kelvion air coolers and dry coolers and supports their maintenance.</p></blockquote><figure style="margin:24px 0;"><img loading="lazy" src="https://www.btc-ksa.com/knowledge-hub/kelvion-industrial-air-cooler.webp" alt="Kelvion industrial air cooler on a steel structure" style="max-width:100%;border-radius:10px;box-shadow:0 12px 30px rgba(0, 0, 0, 0.18);"></figure><p>In refineries, gas plants, compressor stations and power plants across the Kingdom, air coolers replace water cooling where water is scarce. They are designed for a summer design air temperature, but over time their real performance drops below the design curve. The gap shows up as high process outlet temperatures, compressor discharge alarms and reduced throughput on the hottest afternoons.</p><h2>Why capacity falls</h2><table style="width:100%;border-collapse:collapse;margin:16px 0 24px;"><thead><tr><th style="text-align:left;padding:8px 10px;border-bottom:2px solid rgb(21, 101, 192);background:rgb(238, 244, 251);">Cause</th><th style="text-align:left;padding:8px 10px;border-bottom:2px solid rgb(21, 101, 192);background:rgb(238, 244, 251);">Effect</th><th style="text-align:left;padding:8px 10px;border-bottom:2px solid rgb(21, 101, 192);background:rgb(238, 244, 251);">Check</th></tr></thead><tbody><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Fouled fins (dust, sand, oil mist, insects)</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Less airflow and heat transfer</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Inspect with a light behind the bundle; measure air-side pressure drop</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Fan problems: wrong blade pitch, worn belts, slipping drives, failed motors</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Lower airflow</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Measure motor current and airflow; check blade angle and belt tension</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Hot air recirculation</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Inlet air hotter than ambient</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Compare inlet temperature with ambient; review layout, wind and nearby equipment</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Internal fouling</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Lower heat transfer on the process side</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Trend process outlet temperature and pressure drop against design</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Louvres stuck closed, damaged plenums or seals</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Air bypasses the bundle or is restricted</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Inspect louvre linkages, plenum panels and seals</td></tr></tbody></table><h2>Pre-summer checklist</h2><ul><li><p>Clean fins with low-pressure water or air from the air-outlet side, against the airflow, without bending fins; avoid high-pressure jets that flatten them.</p></li><li><p>Set fan blades to the design pitch and check tip clearance to the fan ring.</p></li><li><p>Replace worn belts and check sheave alignment, or check gear drives and couplings.</p></li><li><p>Check fan motors, bearings and vibration switches, and repair any fan out of service before summer.</p></li><li><p>Free and adjust louvres and check the control system and variable-speed drives.</p></li><li><p>Repair plenum panels, seals and fan rings so air passes through the bundle, not around it.</p></li></ul><figure style="margin:24px 0;"><img loading="lazy" src="https://www.btc-ksa.com/knowledge-hub/kelvion-rooftop-air-cooled-heat-exchanger-units.webp" alt="Rooftop air-cooled heat exchanger units with axial fans" style="max-width:100%;border-radius:10px;box-shadow:0 12px 30px rgba(0, 0, 0, 0.18);"></figure><h2>Recirculation and layout</h2><p>Hot exhaust air drawn back into the inlet raises the effective air temperature and can cost several degrees of approach. It is worst for forced-draught units, banks close to buildings or tall equipment, and banks in a crosswind. Wind walls, extended fan stacks or moving nearby obstructions can reduce it. On new projects, spacing and orientation are part of the design, as discussed in <a href="https://www.btc-ksa.com/Knowledge-Hub/post/api-661-air-cooled-heat-exchangers-saudi-arabia">API 661 air coolers</a>.</p><h2>Adding capacity in summer</h2><p>Where cleaning and fan work are not enough, inlet air can be pre-cooled by evaporation, using sprays or adiabatic pads, for a limited number of hot hours each year. Water quality must be controlled to avoid scaling the fins. For larger shortfalls, extra bays or a hybrid system may be needed; see <a href="https://www.btc-ksa.com/Knowledge-Hub/post/adiabatic-coolers-water-saving-saudi-arabia">adiabatic coolers</a> and <a href="https://www.btc-ksa.com/Knowledge-Hub/post/air-fin-coolers-air-cooled-heat-exchangers-saudi-arabia">air fin coolers</a>.</p><h2>Kelvion from BTGC</h2><p>Kelvion supplies air-cooled heat exchangers, dry coolers, plate heat exchangers and shell and tube exchangers for industry and utilities. BTGC is the <a href="https://www.btc-ksa.com/kelvion-saudi-arabia">Kelvion partner in Saudi Arabia</a> for new equipment, replacement bundles and spare parts. See also <a href="https://www.btc-ksa.com/Knowledge-Hub/post/gasketed-plate-heat-exchanger-maintenance-saudi-arabia">plate heat exchanger maintenance</a> and the <a href="https://www.btc-ksa.com/process-separation">process and thermal</a> page.</p><h2>Questions buyers ask</h2><p><strong>How often should air cooler fins be cleaned?</strong> At least once before each summer, and more often in dusty areas or near sources of oil mist; inspection decides.</p><p><strong>Does fan blade pitch really make a difference?</strong> Yes. Blades set below the design angle move less air; resetting them to design, within the motor's power limit, can recover a noticeable part of the lost duty.</p><p><strong>Is spray cooling of fins safe?</strong> Only with treated water and a system designed for it; untreated water leaves scale on fins and reduces performance over time.</p><h2>Contact BTGC</h2><p>Email info@btc-ksa.com or call +966 13 856 0528. Branches: Dammam, Jubail and Yanbu. <a href="https://www.btc-ksa.com/contact#quote">Request a quote</a>.</p></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Mon, 16 Nov 2026 10:44:19 +0300</pubDate></item><item><title><![CDATA[Air-Cooled Heat Exchangers to API 661 for Saudi Refineries]]></title><link>https://www.btc-ksa.com/Knowledge-Hub/post/api-661-air-cooled-heat-exchangers-saudi-arabia</link><description><![CDATA[<img align="left" hspace="5" src="https://www.btc-ksa.com/knowledge-hub/hemaco-shell-and-tube-heat-exchanger-tube-bundle.webp"/>What API 661 requires for air coolers, Saudi supplementary requirements, forced versus induced draft and alloys. Hemaco air-cooled exchangers from BTGC.]]></description><content:encoded><![CDATA[<div class="zpcontent-container blogpost-container "><div data-element-id="elm_cG6h0ot6Ts-_3PD9Zo_Vow" data-element-type="section" class="zpsection "><style type="text/css"></style><div class="zpcontainer-fluid zpcontainer"><div data-element-id="elm_RpwH3o4BTWKCCqHjBJfn6w" data-element-type="row" class="zprow zprow-container zpalign-items- zpjustify-content- " data-equal-column=""><style type="text/css"></style><div data-element-id="elm_fnxL7bHxQ_6OfTmU1Yp2Xw" data-element-type="column" class="zpelem-col zpcol-12 zpcol-md-12 zpcol-sm-12 zpalign-self- "><style type="text/css"></style><div data-element-id="elm_XpCm5clGepEJVrhviyx2hQ" data-element-type="codeSnippet" class="zpelement zpelem-codesnippet "><div class="zpsnippet-container"><p class="btgc-byline" style="margin:0 0 14px;color:rgb(74, 85, 104);font-size:14px;">By <strong>BTGC Engineering Team</strong> · Business Tribune Global Company, Saudi Arabia</p><blockquote style="background:rgb(238, 244, 251);border-left:4px solid rgb(21, 101, 192);padding:14px 18px;margin:0 0 18px;border-radius:6px;"><p><strong>In short:</strong> API 661 is the standard that turns an air cooler from a fan and some finned tubes into a piece of refinery equipment: it fixes the design margins, the header and tube construction, the fan and drive requirements and the inspection and testing. Hemaco builds air-cooled heat exchangers to API 661 and ASME in Italy, and BTGC is its partner in Saudi Arabia for refineries, gas plants and petrochemical units.</p></blockquote><figure style="margin:24px 0;"><img loading="lazy" src="https://www.btc-ksa.com/knowledge-hub/hemaco-shell-and-tube-heat-exchanger-tube-bundle.webp" alt="Shell-and-tube heat exchanger tube bundle in the Hemaco workshop" style="max-width:100%;border-radius:10px;box-shadow:0 12px 30px rgba(0, 0, 0, 0.18);"></figure><p>Saudi Aramco, SABIC and the EPC contractors who build for them specify air coolers to API 661 (ISO 13706), usually with their own supplementary requirements on top. A buyer who understands what the standard asks for can read a vendor's proposal properly, and a vendor who builds to it routinely saves the project months of inspection arguments.</p><h2>What API 661 covers</h2><table style="width:100%;border-collapse:collapse;margin:16px 0 24px;"><thead><tr><th style="text-align:left;padding:8px 10px;border-bottom:2px solid rgb(21, 101, 192);background:rgb(238, 244, 251);">Area</th><th style="text-align:left;padding:8px 10px;border-bottom:2px solid rgb(21, 101, 192);background:rgb(238, 244, 251);">Key requirements</th></tr></thead><tbody><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Thermal design</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Design air temperature, fouling factors, fan power margin, minimum face velocity, no credit for wind</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Tube bundles</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Minimum tube wall, fin types and temperature limits, tube-to-header joint, bundle rigidity</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Headers</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Plug, cover plate or manifold type by pressure and fouling; plug and gasket materials; ASME VIII design</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Fans and drives</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Fan tip speed limits, blade pitch, belt or gear drives, vibration switches, motor sizing at minimum air temperature</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Structure</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Plenum and support design, access platforms, wind and seismic loads, hot-dip galvanising</td></tr><tr><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Inspection and testing</td><td style="padding:8px 10px;border-bottom:1px solid rgb(227, 232, 238);vertical-align:top;">Hydrotest, fan performance, shop run test, documentation and data sheets</td></tr></tbody></table><h2>Saudi supplementary requirements</h2><p>The operator's standards add to API 661 in predictable places: a design air temperature of 46 to 50 &deg;C, galvanising and coating systems for the coastal atmosphere, sand and dust provisions, specific fan and motor makes, and material requirements for sour service (NACE MR0175 / ISO 15156) where wet H2S is present. A fabricator used to working with operator supplements makes the difference between a smooth document review and a long one, so ask for the reference list with the offer.</p><h2>Forced or induced draft?</h2><p>Forced draft units put the fans below the bundle: easier maintenance, lower cost, but the hot air leaves slowly and can recirculate. Induced draft units put the fans above: better air distribution, higher stack velocity and less recirculation, at the price of fan components in hot air. For Saudi sites with large banks of coolers and a hot-air recirculation risk, induced draft is often preferred; for small or isolated units forced draft is common. API 661 allows both and the choice is made in the data sheet.</p><h2>Special alloys and difficult services</h2><p>Hemaco's strength is in exchangers that are not catalogue items: air coolers with duplex, super duplex or titanium tubes for sour and chloride services, high-pressure header boxes for hydrotreater effluent, and combined packages with the shell and tube exchangers and pressure vessels described in the earlier article on <a href="https://www.btc-ksa.com/Knowledge-Hub/post/shell-and-tube-heat-exchanger-alloys-saudi-arabia">exchangers in special alloys</a>.</p><figure style="margin:24px 0;"><img loading="lazy" src="https://www.btc-ksa.com/knowledge-hub/kelvion-rooftop-air-cooled-heat-exchanger-units.webp" alt="Air-cooled heat exchanger units with axial fans" style="max-width:100%;border-radius:10px;box-shadow:0 12px 30px rgba(0, 0, 0, 0.18);"></figure><h2>Hemaco from BTGC</h2><p>Hemaco S.r.l., Italy, designs and fabricates shell and tube heat exchangers, air-cooled heat exchangers and pressure vessels to ASME, TEMA and API 661, with U-stamp and the material certifications Saudi projects require. BTGC is the <a href="https://www.btc-ksa.com/hemaco-saudi-arabia">Hemaco partner in Saudi Arabia</a>, coordinating enquiries, engineering clarifications, inspection visits, shipping and site support. See the <a href="https://www.btc-ksa.com/process-separation">process and thermal</a> page and the <a href="https://www.btc-ksa.com/oil-gas">oil and gas sector page</a>.</p><h2>Questions buyers ask</h2><p><strong>What documents come with an API 661 unit?</strong> Data sheets, thermal and mechanical calculations, drawings, material certificates, weld procedures, NDT reports, hydrotest and fan test reports and the ASME data report.</p><p><strong>Can Hemaco supply replacement bundles for existing coolers?</strong> Yes, to the original data sheet or an uprated design, in the original or an improved material.</p><p><strong>What delivery time should we plan?</strong> Typically 6 to 9 months for a full unit, less for bundles; BTGC tracks the schedule with the factory.</p><h2>Contact BTGC</h2><p>Email info@btc-ksa.com or call +966 13 856 0528. Branches: Dammam, Jubail and Yanbu. <a href="https://www.btc-ksa.com/contact#quote">Request a quote</a>.</p></div>
</div></div></div></div></div></div> ]]></content:encoded><pubDate>Sun, 15 Nov 2026 08:36:43 +0300</pubDate></item></channel></rss>