Gas-Insulated Switchgear for Saudi Substations

15.11.26 08:27 AM

In short: gas-insulated switchgear (GIS) puts a 132 kV or 380 kV substation into a tenth of the footprint of an air-insulated one, sealed against dust, salt and humidity. For an industrial city plot, a coastal plant or a substation that has to grow inside an existing fence, it is often the only option. BTGC is the HD Hyundai Electric partner in Saudi Arabia for GIS, power transformers and switchgear.

HD Hyundai Electric power transformer and gas-insulated switchgear

A conventional air-insulated 132 kV bay needs clearances of several metres between phases and to ground, and it sits in the open where the Gulf's dust and salt settle on every insulator. GIS encloses the busbars, breakers, disconnectors and earthing switches in grounded aluminium enclosures filled with SF6 or an SF6-free gas mixture. The clearances shrink by a factor of ten, and the live parts never see the weather.

When GIS is the right choice

  • Space: an industrial plot in Jubail or Ras Al Khair where land is allocated by the square metre, or a plant expansion that must fit inside the existing substation building.

  • Environment: coastal sites with salt fog, cement and steel plants with conductive dust, and anywhere sandstorms make insulator washing a routine job.

  • Availability: GIS needs maintenance at intervals of 10 to 20 years rather than the regular cleaning and inspection an AIS yard needs.

  • Safety: no exposed live parts, lower arc flash exposure for operators.

What to specify

ItemWhy it matters
Rated voltage and short-circuit level72.5, 145, 245, 420 kV classes; 40 or 50 kA fault level drives the breaker and enclosure design
Bus schemeSingle bus, double bus or breaker-and-a-half; set by the operator's availability requirement
Indoor or outdoorIndoor GIS in a ventilated building is the norm in the Kingdom; outdoor GIS needs sun shields and coating specs
Ambient temperature50 °C design ambient affects current rating and building HVAC
Gas monitoringDensity monitors per compartment, with alarms to the SCADA system
InterfacesCable sealing ends, SF6-to-air bushings or direct transformer connections

GIS and the transformer together

The cleanest substation layout connects the GIS directly to the power transformer through an oil-to-gas bushing, removing the outdoor bus and its insulators. HD Hyundai Electric builds both the GIS and the transformer, so the interface is engineered once rather than negotiated between two vendors. The same applies to the medium voltage side: HD Hyundai Electric metal-clad switchgear and vacuum breakers complete the substation. BTGC's earlier article on power transformer specification covers the transformer side.

Local conditions and local content

Saudi Electricity Company and the industrial-city utilities have detailed GIS specifications, including seismic requirements for some regions, 50 °C ambient, and type test reports to IEC 62271-203. For private plants, the owner usually adopts the SEC specification as a baseline. Local content targets can be met with Saudi-made distribution transformers, cables and civil works alongside the imported GIS, and BTGC structures the package that way when the project asks for it.

HD Hyundai Electric oil-immersed power transformer supplied by BTGC

HD Hyundai Electric from BTGC

HD Hyundai Electric Co., Ltd., Korea, manufactures GIS from 72.5 kV to 800 kV, power transformers to 765 kV, medium and low voltage switchgear and large rotating machines, with long reference lists in the Saudi grid and in industrial plants. BTGC is the HD Hyundai Electric partner in Saudi Arabia for industrial and utility customers, from specification and tendering to site support and spare parts. See the electrical and power systems page and the power and utilities sector page.

Questions buyers ask

Is SF6-free GIS available? Alternative gas mixtures and vacuum-based designs are available for the lower voltage classes; ask BTGC for the current HD Hyundai Electric options for the voltage you need.

How long does a GIS project take? Typically 12 to 18 months from order to energisation for a 132 kV substation, with civil works running in parallel with manufacturing.

Who maintains the GIS after commissioning? HD Hyundai Electric service engineers with BTGC coordination; the maintenance interval is long but the gas handling needs certified staff.