In short: many gear unit failures start in the first hours of running: dirt left in the oil system, poor alignment or a tooth contact pattern that loads only one end of the teeth. A careful commissioning routine prevents this. Flush the oil system until it is clean, align the train for running conditions, start on light load, check the tooth contact pattern and record vibration and temperatures as a baseline. BTGC supplies SEISA Gear units and spare parts.

Compressor, pump and turbine trains in Saudi plants are often commissioned during tight project or turnaround schedules, when shortcuts are tempting.
Commissioning steps
| Step | What to check |
|---|---|
| Installation | Foundation, soleplates, grouting and bolt torque |
| Alignment | Cold alignment that allows for thermal growth and shaft movement |
| Oil system flushing | Flush pipes and coolers to the required cleanliness before oil enters the gear unit |
| First start | Oil pressure, flow and temperatures before load is applied |
| Run-in | Step up the load, checking noise, vibration and bearing temperatures |
| Contact pattern | Check tooth marking with marking compound or by inspection after run-in |
Why oil cleanliness comes first
Welding slag, scale and sand from construction damage bearings and gear teeth in minutes.
Flush with temporary filters and bypass loops until particle counts meet the target.
Check coolers and pipework installed on site, not only the factory-supplied parts.
Take an oil sample after run-in to confirm cleanliness.

Baseline data
Record vibration spectra, bearing temperatures and oil temperatures at stable load.
Photograph the tooth contact pattern for future comparison.
Keep alignment readings, coupling data and oil analysis together in the unit file.
Use the baseline for later condition monitoring and to spot tooth damage early.
SEISA Gear from BTGC
SEISA Gear, Ltd. of Japan makes high-speed gear units, epicyclic gears and gear couplings. BTGC supplies SEISA Gear in Saudi Arabia with spare parts and selection support. See also gear couplings and alignment and the rotating equipment page.
Questions buyers ask
How long should run-in take? It depends on the unit and duty; the maker's instructions give the load steps and times.
What does a good contact pattern look like? Even marking across the face width, without heavy contact at one end.
Should the first oil fill be changed early? Often yes, or at least filtered and tested after run-in.
Contact BTGC
Email info@btc-ksa.com or call +966 13 856 0528. Branches: Dammam, Jubail and Yanbu. Request a quote.