In short: a leaking shell and tube exchanger can be plugged, retubed, fitted with a new bundle or replaced. Plugging is quick but costs capacity; retubing keeps the shell and tubesheets; a new bundle or exchanger fixes the root cause when material or design is wrong. BTGC supplies Hemaco heat exchangers and replacement bundles for Saudi refineries and petrochemical plants.

Tube leaks are the most common shell and tube exchanger failure in Saudi plants, usually from corrosion on the cooling water side, erosion at the tube inlet or vibration damage at baffles. The plant's choice after an eddy current inspection depends on how many tubes are affected, how fast the damage is growing and whether the tube material is right for the service.
Four options
| Option | When it fits | Trade-off |
|---|---|---|
| Plug leaking tubes | Few tubes, isolated damage | Lost area and higher velocity in remaining tubes; most designs allow up to about 10 per cent plugged |
| Retube in place | Tubesheets and shell sound, many tubes thinning | Weeks of outage; tube material can be upgraded |
| New bundle | Removable bundle designs; tubesheet or baffle damage | Fast swap if the bundle is made in advance |
| New exchanger | Shell damage, wrong design or a changed duty | Highest cost; chance to correct the design |
Fix the cause, not just the tubes
Cooling water corrosion: upgrade tube material, as discussed in exchangers in special alloys.
Inlet erosion: fit tube inserts or ferrules.
Vibration: check baffle spacing and flow rates against the original design.
Fouling: review velocity and cleaning access.

Hemaco from BTGC
Hemaco designs and fabricates shell and tube exchangers, air coolers and pressure vessels to ASME and TEMA. BTGC is the Hemaco partner in Saudi Arabia for new units and replacement bundles built to the original data sheet or an improved design. See also API 661 air coolers and the process and thermal page.
Questions buyers ask
Can a replacement bundle be made from the old drawings? Yes, and the design can be checked and improved at the same time.
What inspection data is needed? Eddy current results, tube material, operating data and the original data sheet if available.
How long does a new bundle take? Typically several months; ordering ahead of the outage is the way to avoid a long shutdown.