Blog tagged as Arabian Transformers

Distribution Transformer Maintenance: Oil, Breathers and Bushings
Routine care for oil-immersed distribution transformers: oil tests, breathers, gaskets and leaks, bushings, tap settings and thermography in hot climates. ATC.
18.11.26 02:25 PM - Comment(s)
Transformer Commissioning Tests: What to Check Before Energising
Which tests to run before energising a transformer: oil, insulation, winding resistance, ratio, vector group, SFRA and protection. ATC, BTGC.
18.11.26 09:02 AM - Comment(s)
Dry-Type vs Oil-Immersed Transformers: Choosing for Buildings, Plants and Outdoor Sites
When to choose cast resin dry-type or oil-immersed transformers: fire safety, location, overload, cost, cooling and upkeep. Arabian Transformers, BTGC.
18.11.26 07:33 AM - Comment(s)
Transformers for Solar PV Plants: Inverter Duty, Harmonics and Desert Heat
What solar PV plants need from step-up transformers: inverter-duty design, harmonics, daily load cycles, desert heat and dust, and local supply. ATC from BTGC.
17.11.26 03:18 PM - Comment(s)
Compact Substations and Package Units for Industrial and Infrastructure Sites
What compact (packaged) substations include, when they beat a built substation, IEC 62271-202 points, and how to handle heat and maintenance. ATC from BTGC.
17.11.26 12:41 PM - Comment(s)

Tags