In short: turbine bypass valves let a combined cycle or cogeneration plant send steam around the steam turbine during start-up, shutdown, load rejection or a turbine trip. The HP bypass drops main steam to cold reheat conditions and the LP bypass dumps reheat steam to the condenser, both with water injection to cool the steam. They must open in seconds, control smoothly and shut tight, while facing severe pressure drops, thermal shock and noise. BTGC supplies KOSO severe service control valves, including bypass valves.

Combined cycle and cogeneration plants in the Kingdom often cycle daily or run at changing loads in summer and winter. Bypass systems are used far more than designers expected, and leaking or slow bypass valves cost fuel and availability.
HP and LP bypass at a glance
| Item | HP bypass | LP bypass |
|---|---|---|
| Steam path | Main steam to cold reheat | Hot reheat to condenser |
| Cooling water | Feedwater spray | Condensate spray |
| Main duties | Start-up, trip, pressure control | Start-up, trip, condenser protection |
| Key risks | Thermal shock, seat erosion | Noise, vibration, condenser overload |
Why bypass valves fail
Very high pressure drops erode trim and seats, especially when valves throttle near closed.
Fast heating during trips causes thermal shock and cracking.
Spray water valves suffer cavitation; see spray water control valves.
Seat leakage when closed wastes steam and heat rate.
Actuator and positioner problems slow the response during a trip.

Keeping bypass systems reliable
Specify multi-stage pressure-reducing trim and tight shutoff for the real operating range.
Check stroke time and fail action at every outage.
Monitor downstream temperature to detect seat leakage early.
Inspect desuperheater nozzles and spray valves for wear and blockage.
Plan trim and seat spares before major outages; see control valve overhaul.
KOSO from BTGC
Nihon KOSO makes severe service control valves, actuators and positioners for power, oil and gas and process plants. BTGC is the KOSO partner in Saudi Arabia, with valve testing and repair at the Jubail service center. See also steam pressure reducing valves, cavitation and noise and the power and utilities sector page.
Questions buyers ask
Why does a combined cycle plant need bypass valves? To run the gas turbine and HRSG while the steam turbine is starting, tripped or shut down.
How fast must bypass valves open? Typically within a few seconds after a turbine trip, as set by the plant design.
Can BTGC repair bypass valves? Yes, testing and repair at the Jubail service center, with KOSO parts.
Contact the BTGC valve team
Email valves@btc-ksa.com or call +966 13 856 0528. Branches: Dammam, Jubail and Yanbu. Request a quote.